Since March of 2002 Tom Wait has supervised thousands of feet of Water Wick drainage. In the past 10 years the Water Wick has a 100% success rate.
The Greens Encroachment Barrier Gallery
The Water Wick Drainage System Gallery
Subsurface Equipment Repair & Installation Gallery